• WWII Weapons cost, mostly aircraft. (1/3)

    From Geoffrey Sinclair@21:1/5 to All on Sat Oct 9 23:38:10 2021
    What does an aircraft cost has the answer it depends. The following is a collection of figures and show plenty of variation. Things like whether
    spare parts are included, if a company is making more than one product how things like head office costs are allocated, whether depreciation of the building etc. is included.

    In April 1938 the British calculated the total cost of ownership of a naval aircraft, that is purchase, running and modernisation cost, as 11,500 pounds per year, which meant it was about 6 aircraft to the destroyer.

    Australian Archives MP450/1 109 Detailed break down of Beaufort costs, per aircraft in Australian pounds.
    Tooling 1,895, preliminary expenses 532, Improvements and extensions to properties 893 (Railways 554, Holden 186, other contractors 10, stores,
    flight field and plants 143), Plant, machinery and equipment 1,136, office furniture 168, which gives a total of 4,623 of establishment costs per aircraft.

    Newport Workshop 1,477 (Labor 622, overhead 693, sub contract 162), Chullora Workshop 2,019 (Labor 734, overhead 1,155, sub contract 130), Islington Workshop 1,342 (Labor 516, overhead 745, sub contract 81),

    Assembly Workshops Mascot/Fishermans Bend 2,510 (Labor 1,038, overhead
    1,472), Holden production cost per aircraft set 2,321, Richards Industries production cost per aircraft set 292, freight 350, central office overhead 3,224, Materials (including sub contractors' costs other than Holden or Richards Industries) Holden 821 (746 plus 75 for ten percent allowance), Richards Industries 44 (40 plus 4 for ten percent allowance), Newport (795
    plus 79 for ten percent allowance), Chullora (2,780 plus 278 for ten percent allowance), Islington 1,407 (1,279 plus 128 for ten percent allowance), Assembly (4,446 plus 445 for ten percent allowance). Appendix A equipment including gun turret 2,627 (Which gives the airframe cost as 27,257),
    Engines and Propellers (Overseas costs, Wasp engines and Curtiss propellers) 12,546 (Which gives total aircraft cost of 39,803). So 39,803 plus 4,623
    gives total costs per completed aircraft as 44,426 pounds. The above
    excluding license fees.

    Firstly some US data. Ford Willow run used more tooling and so less man
    hours but costs about the same, for a variety of reasons including the
    frequent design changes.

    Aircraft Unit costs, US Archives RG18 E 10 B 68, CF Contractor Furnished,
    GFE Government Furnished Equipment
    Date / Model / Airframe / Engines(s) / Propeller(s) / GFE / Ordnance / Communications / Total / Notes
    28-Feb-43 / B-29 / $362,347 / $101,685 / $10,328 / $125,341 /
    $4,836 / $34,738 / $639,275 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / B-32 / $522,613 / $101,685 / $23,310 / $68,947 / $3,247
    / $34,150 / $753,952 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / B-17 / $111,443 / $34,287 / $3,400 / $45,606 / $4,595
    / $9,040 / $208,371 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / B-24 / $115,338 / $32,659 / $4,220 / $49,781 / $3,205
    / $8,474 / $213,677 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / B-25 / $59,358 / $29,131 / $3,071 / $19,805 / $4,147 / $8,337 / $123,849 / Costs based on weighted average of uncompleted
    contracts
    28-Feb-43 / B-26 / $106,677 / $43,171 / $14,110 / $21,647 / $3,547
    / $7,749 / $196,901 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / B-34 / $108,558 / $44,000 / $5,000 / $29,449 / CF / $1,250 / $188,257 / Costs based on final production contract
    28-Feb-43 / A-20 / $44,366 / $30,795 / $4,428 / $18,364 / $2,345 / $3,813 / $104,111 / Costs based on final production contract
    28-Feb-43 / A-26 / $106,807 / $33,466 / $3,700 / $29,277 / $14,067
    / $3,948 / $191,265 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / A-28 / $93,725 / $19,634 / $5,000 / $9,038 / $- /
    $250 / $127,647 / Costs based on final production contract
    28-Feb-43 / A-29 / $91,688 / $23,000 / $5,000 / $9,038 / $2,093 / $250 / $131,069 / Costs based on final production contract
    28-Feb-43 / A-30 / $103,962 / $29,104 / $4,668 / $3,712 / $2,737 / $6,777 / $150,960 / Costs based on final production contract
    28-Feb-43 / A-24 / $33,172 / $9,103 / $1,739 / $1,997 / $1,640 / $4,800 / $52,451 / Costs based on final production contract
    28-Feb-43 / A-25 / $67,492 / $13,559 / $3,988 / $1,997 / $2,240 / $3,500 / $92,776 / Costs based on final production contract
    28-Feb-43 / A-31 / $67,230 / $13,859 / $2,330 / $1,863 / $1,978 / $250 / $87,510 / Costs based on final production contract
    28-Feb-43 / A-35 / $36,874 / $13,351 / $2,353 / $3,026 / $2,270 / $3,911 / $61,785 / Costs based on final production contract
    28-Feb-43 / A-36 (P-51) / $36,706 / $12,000 / $3,680 / $2,670 /
    $2,632 / $2,516 / $60,204 / Costs based on final production contract 28-Feb-43 / P-38 / $74,536 / $18,866 / $5,270 / $5,293 / $2,405 / $3,631 / $110,001 / Costs based on weighted average of uncompleted
    contracts
    28-Feb-43 / P-59 / $157,295 / $75,000 / $- / $2,001 / $4,034 /
    $2,864 / $241,194 / Costs based on weighted average of uncompleted
    contracts
    28-Feb-43 / P-61 / $154,899 / $44,714 / $6,352 / $14,507 / $4,684
    / $19,758 / $244,914 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / P-70 / $79,865 / $29,372 / $5,186 / $24,052 / $1,341 / $3,260 / $143,076 / Costs based on final production contract
    28-Feb-43 / P-82 / $86,540 / $36,000 / $7,471 / $3,967 / $1,870 / $1,545 / $137,393 / Costs based on weighted average of uncompleted
    contracts
    28-Feb-43 / P-39 / $24,866 / $12,545 / $3,256 / $2,673 / $4,712 / $2,633 / $50,685 / Costs based on final production contract
    28-Feb-43 / P-40 / $26,709 / $7,714 / $2,635 / $2,068 / $2,646 / $2,904 / $44,676 / Costs based on final production contract
    28-Feb-43 / P-43 / $54,907 / $12,635 / $4,500 / $5,231 / $2,490 / $3,160 / $82,923 / Costs based on final production contract
    28-Feb-43 / P-47 / $47,796 / $22,608 / $5,975 / $5,651 / $2,527 / $3,295 / $87,852 / Costs based on weighted average of uncompleted
    contracts
    28-Feb-43 / P-51 / $23,583 / $17,558 / $3,740 / $2,649 / $1,905 / $2,780 / $52,215 / Merlin Versions. Costs based on weighted average of uncompleted contracts
    28-Feb-43 / P-63 / $28,049 / $13,183 / $3,540 / $3,693 / $4,296 / $2,640 / $55,401 / Costs based on weighted average of uncompleted
    contracts
    28-Feb-43 / P-66 / $70,503 / $17,509 / CF / CF / No info. /
    $3,160 / $91,172 / Costs based on final production contract
    28-Feb-43 / P-75 / $82,863 / $31,420 / $9,083 / $2,788 / $4,366 / $3,688 / $134,208 / Costs based on weighted average of uncompleted
    contracts
    28-Feb-43 / P-80 / $75,913 / $30,000 / $- / $2,944 / $1,897 /
    $2,317 / $113,071 / Costs based on weighted average of uncompleted
    contracts
    28-Feb-43 / F-3 (A-20) / $103,627 / $29,372 / $5,186 / $20,207 /
    $1,341 / $3,260 / $162,993 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / F-11 / $447,770 / $110,000 / $25,000 / $10,647 / $15 / $10,500 / $603,932 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / OA-10 (PBY) / $216,250 / CF / CF / $559 / $- / CF / $216,809 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / OA-11 / $175,000 / CF / CF / CF / $- / $- /
    $175,000 / Costs based on final production contract
    28-Feb-43 / OA-12 (J2F) / $69,000 / CF / CF / CF / $- / $- / $69,000 / Costs based on final production contract
    28-Feb-43 / TO-50 / $48,431 / CF / $250 / $919 / $26 / $1,200 / $50,826 / Costs based on final production contract
    28-Feb-43 / O-52 / $24,558 / $6,000 / $1,575 / $4,780 / $697 /
    $4,930 / $42,540 / Costs based on final production contract
    28-Feb-43 / C-54 / $243,277 / $50,186 / $5,200 / $10,888 / $113 / $7,995 / $317,659 / Costs based on weighted average of uncompleted
    contracts
    28-Feb-43 / C-69 / $488,477 / $95,643 / $6,360 / $10,788 / $15 / $7,067 / $608,350 / Costs based on weighted average of uncompleted
    contracts
    28-Feb-43 / C-74 / $949,485 / $220,000 / $12,200 / $19,698 / $15 / $6,761 / $1,208,159 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / C-87 / $161,800 / $35,933 / $9,840 / $21,111 / $484 / $6,935 / $236,103 / Costs based on final production contract
    28-Feb-43 / C-45 / $34,963 / $8,917 / $1,892 / $4,027 / No info. / $3,670 / $53,469 / Costs based on weighted average of uncompleted
    contracts
    28-Feb-43 / C-46 / $174,660 / $28,080 / $9,630 / $8,600 / $13 / $9,277 / $230,260 / Costs based on weighted average of uncompleted
    contracts
    28-Feb-43 / C-47 / $49,719 / $13,650 / $2,640 / $8,029 / $14 / $14,575 / $88,627 / Costs based on weighted average of uncompleted
    contracts
    28-Feb-43 / C-48 / $91,000 / $30,000 / $4,594 / $413 / $30 /
    $8,460 / $134,497 / Costs based on final production contract
    28-Feb-43 / C-49 / $136,997 / CF / CF / $1,844 / $15 / $8,811 / $147,667 / Costs based on final production contract
    28-Feb-43 / C-50 / $95,381 / $19,104 / $4,594 / $725 / No info. / $7,849 / $127,653 / Costs based on final production contract
    28-Feb-43 / C-51 / $100,689 / $18,324 / $4,594 / $725 / No info. / $7,849 / $132,181 / Costs based on final production contract
    28-Feb-43 / C-52 / $105,973 / $24,780 / $4,594 / $725 / No info. / $7,849 / $143,921 / Costs based on final production contract
    28-Feb-43 / C-53 / $142,231 / CF / CF / $1,844 / $15 / $6,380 / $150,470 / Costs based on final production contract
    28-Feb-43 / C-55 / $353,707 / CF / CF / CF / No info. / $7,849 /
    $361,556 / Costs based on final production contract
    28-Feb-43 / C-56 / $108,797 / CF / CF / CF / No info. / No info. /
    $108,797 / Costs based on final production contract
    28-Feb-43 / C-57 / $112,377 / CF / CF / CF / No info. / No info. /
    $112,377 / Costs based on final production contract
    28-Feb-43 / C-59 / $92,833 / $17,000 / CF / CF / $- / $250 /
    $110,083 / Costs based on final production contract
    28-Feb-43 / C-60 / $79,644 / $18,057 / $4,472 / $4,038 / $15 /
    $6,942 / $113,168 / Costs based on final production contract
    28-Feb-43 / C-68 / $139,966 / CF / CF / CF / No info. / $7,849 / $147,815 / Costs based on final production contract
    28-Feb-43 / C-76 / $137,125 / $14,690 / $5,950 / $9,280 / $15 / $7,100 / $174,160 / Costs based on final production contract
    28-Feb-43 / C-78 / $16,873 / $5,852 / $1,988 / $2,657 / $15 /
    $6,348 / $33,733 / Costs based on final production contract
    28-Feb-43 / C-82 / $427,244 / $36,000 / $3,880 / $8,592 / $15 / $6,415 / $482,146 / Costs based on weighted average of uncompleted
    contracts
    28-Feb-43 / C-43 / $18,732 / $5,074 / $1,104 / $1,162 / $- /
    $1,260 / $27,332 / Costs based on final production contract
    28-Feb-43 / C-61 / $9,464 / $4,093 / CF / $207 / $- / $2,209 / $15,973 / Costs based on final production contract
    28-Feb-43 / C-64 / $24,839 / $5,869 / $855 / $2,134 / $10 /
    $1,544 / $35,251 / Costs based on weighted average of uncompleted
    contracts
    28-Feb-43 / AT-7 / $41,719 / $14,519 / $2,050 / $8,250 / $- /
    $3,671 / $70,209 / Costs based on final production contract
    28-Feb-43 / AT-8 / $25,646 / $7,438 / $1,932 / $5,455 / $- /
    $1,230 / $41,701 / Costs based on final production contract
    28-Feb-43 / AT-9 / $27,603 / $6,947 / $1,700 / $7,042 / $- /
    $1,100 / $44,392 / Costs based on final production contract
    28-Feb-43 / AT-10 / $29,600 / $7,534 / $1,665 / $5,271 / $- /
    $925 / $44,995 / Costs based on final production contract
    28-Feb-43 / AT-11 / $36,447 / $14,519 / $1,965 / $8,250 / $650 / $2,636 / $64,467 / Costs based on final production contract
    28-Feb-43 / AT-17 / $17,383 / $5,852 / $354 / $2,781 / $- /
    $1,100 / $27,470 / Costs based on final production contract
    28-Feb-43 / AT-18 / $82,309 / $18,339 / $4,600 / $7,863 / $1,025 / $6,586 / $120,722 / Costs based on final production contract
    28-Feb-43 / AT-20 / $44,737 / CF / CF / CF / $- / No info. / $44,737 / Costs based on final production contract
    28-Feb-43 / AT-21 / $60,715 / $24,292 / $1,740 / $8,473 / $1,025 / $2,829 / $99,074 / Costs based on final production contract
    28-Feb-43 / AT-6 / $11,500 / $5,869 / $853 / $2,409 / $270 /
    $1,318 / $22,219 / Costs based on weighted average of uncompleted
    contracts
    28-Feb-43 / AT-16 / $18,594 / $5,880 / $1,068 / $1,874 / $- / CF
    / $27,416 / Costs based on final production contract
    28-Feb-43 / AT-19 / $17,736 / $3,470 / $850 / $440 / $- / No
    info. / $22,496 / Costs based on final production contract
    28-Feb-43 / BT-12 / $29,159 / $8,558 / $900 / $2,335 / $- /
    $1,385 / $42,337 / Costs based on final production contract
    28-Feb-43 / BT-13 / $7,076 / $7,260 / $900 / $2,360 / $- / $1,352
    / $18,948 / Costs based on final production contract
    28-Feb-43 / BT-15 / $13,778 / $5,542 / $900 / $2,313 / $- /
    $1,356 / $23,889 / Costs based on final production contract
    28-Feb-43 / PT-13 / $6,045 / $4,227 / $645 / $1,374 / $- / $- / $12,291 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / PT-17 / $5,530 / $2,350 / $357 / $602 / $- / $97 / $8,936 / Costs based on final production contract
    28-Feb-43 / PT-18 / $5,943 / $2,400 / $377 / $1,099 / $- / $- / $9,819 / Costs based on final production contract
    28-Feb-43 / PT-19 / $8,107 / $3,317 / $150 / $429 / $- / $97 / $12,100 / Costs based on final production contract
    28-Feb-43 / PT-22 / $8,226 / CF / CF / $247 / $- / $- / $8,473 / Costs based on final production contract
    28-Feb-43 / PT-23 / $11,059 / $3,316 / $215 / $755 / $- / $97 / $15,442 / Costs based on final production contract
    28-Feb-43 / PT-24 / $5,133 / Brit. Fr. / CF / CF / $- / $83 / $5,216
    / Costs based on final production contract
    28-Feb-43 / PT-26 / $10,285 / $3,187 / $150 / $1,347 / $- / $83
    / $15,052 / Costs based on final production contract
    28-Feb-43 / PT-27 / $5,341 / $2,678 / CF / CF / $- / $83 /
    $8,102 / Costs based on final production contract
    28-Feb-43 / L-1 / $20,368 / $3,860 / $1,125 / $1,191 / $26 /
    $1,200 / $27,770 / Costs based on final production contract
    28-Feb-43 / L-2 / $2,667 / CF / CF / $84 / $- / $247 / $2,998
    / Costs based on final production contract
    28-Feb-43 / L-3 / $2,138 / CF / CF / $11 / $- / $247 / $2,396
    / Costs based on final production contract
    28-Feb-43 / L-4 / $2,227 / CF / CF / $152 / $- / $247 / $2,626
    / Costs based on final production contract
    28-Feb-43 / L-5 / $6,164 / $1,956 / $352 / $427 / $10 / $263 / $9,172 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / L-6 / $6,054 / CF / CF / $11 / $- / $61 / $6,126 / Total in table minus Comms cost. Costs based on final production contract 28-Feb-43 / R-4 / $39,317 / $3,401 / $- / $667 / $- / $229 / $43,614 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / R-5 / $50,600 / $7,259 / $- / $1,208 / $10 / $1,460
    / $60,537 / Costs based on weighted average of uncompleted contracts 28-Feb-43 / R-6 / $41,222 / $4,663 / $- / $1,153 / $10 / $1,152
    / $48,200 / Costs based on weighted average of uncompleted contracts 30-Nov-44 / B-29 / $434,512 / $101,877 / $13,628 / $124,787 /
    $5,531 / $34,738 / $715,073 / Costs based on uncompleted contracts 30-Nov-44 / B-32 / $522,816 / $101,877 / $24,892 / $71,208 / $4,624
    / $34,150 / $759,567 / Costs based on uncompleted contracts
    30-Nov-44 / B-17 / $125,464 / $34,875 / $6,487 / $46,413 / $5,686
    / $9,040 / $227,965 / Costs based on uncompleted contracts
    30-Nov-44 / B-24 / $114,951 / $34,497 / $8,663 / $48,288 / $4,505
    / $8,474 / $219,378 / Costs based on uncompleted contracts
    30-Nov-44 / B-25 / $89,920 / $29,131 / $3,071 / $19,703 / $5,837 / $8,337 / $155,999 / Costs based on uncompleted contracts
    30-Nov-44 / B-26 / $110,260 / $43,171 / $14,110 / $21,647 / $5,028
    / $7,749 / $201,965 / Costs based on uncompleted contracts
    30-Nov-44 / A-26 / $116,760 / $34,194 / $3,034 / $29,488 / $13,213
    / $3,939 / $200,628 / Costs based on uncompleted contracts
    30-Nov-44 / P-38 / $74,673 / $18,867 / $5,270 / $6,199 / $2,901 / $3,631 / $111,541 / Costs based on uncompleted contracts
    30-Nov-44 / P-59 / $129,296 / $75,000 / $- / $2,001 / $4,034 /
    $2,864 / $213,195 / Costs based on uncompleted contracts
    30-Nov-44 / P-61 / $147,960 / $44,729 / $9,720 / $17,611 / $6,245
    / $19,758 / $246,023 / Costs based on uncompleted contracts
    30-Nov-44 / P-82 / $86,540 / $36,000 / $9,200 / $3,229 / $444 / $1,545 / $136,958 / Costs based on uncompleted contracts
    30-Nov-44 / P-47 / $49,420 / $22,608 / $5,257 / $5,210 / $3,506 / $3,295 / $89,296 / Costs based on uncompleted contracts
    30-Nov-44 / P-51 / $25,795 / $17,558 / $2,555 / $2,234 / $2,559 / $2,780 / $53,481 / Costs based on uncompleted contracts
    30-Nov-44 / P-63 / $29,194 / $13,183 / $3,282 / $3,373 / $5,140 / $2,638 / $56,810 / Costs based on uncompleted contracts
    30-Nov-44 / P-75 / $82,863 / $31,420 / $9,083 / $2,788 / $4,366 / $3,688 / $134,208 / Costs based on uncompleted contracts
    30-Nov-44 / P-80 / $55,845 / $55,000 / $- / $3,035 / $2,632 /
    $3,500 / $120,012 / Costs based on uncompleted contracts
    30-Nov-44 / YP-60 / $1,293,710 / $24,868 / $6,881 / $2,722 / $1,784
    / $4,673 / $1,334,638 / Costs based on uncompleted contracts
    30-Nov-44 / F-11 / $447,770 / $110,000 / $25,000 / $10,647 / $15 / $10,500 / $603,932 / Costs based on uncompleted contracts
    30-Nov-44 / OA-10 (PBY) / $216,058 / CF / CF / $559 / $- / CF /
    $216,617 / Costs based on uncompleted contracts
    30-Nov-44 / C-54 / $256,186 / $58,094 / $6,287 / $9,949 / $15 / $7,637 / $338,168 / Costs based on uncompleted contracts
    30-Nov-44 / C-69 / $534,707 / $95,678 / $6,360 / $7,736 / $15 / $7,067 / $651,563 / Costs based on uncompleted contracts
    30-Nov-44 / C-74 / $949,740 / $92,379 / $12,200 / $27,356 / $15 / $6,761 / $1,088,451 / Costs based on uncompleted contracts
    30-Nov-44 / C-45 / $36,585 / $10,705 / $2,050 / $4,894 / $- /
    $3,671 / $57,905 / Costs based on uncompleted contracts
    30-Nov-44 / C-46 / $174,696 / $31,748 / $12,244 / $8,785 / $15 / $9,277 / $236,765 / Costs based on uncompleted contracts
    30-Nov-44 / C-47 / $53,490 / $13,733 / $3,028 / $7,805 / $15 / $15,220 / $93,291 / Costs based on uncompleted contracts
    30-Nov-44 / C-82 / $427,244 / $31,748 / $3,880 / $8,205 / $15 / $6,415 / $477,507 / Costs based on uncompleted contracts
    30-Nov-44 / C-64 / $24,839 / $5,933 / $1,055 / $2,056 / $14 /
    $1,544 / $35,441 / Costs based on uncompleted contracts
    30-Nov-44 / AT-6 / $13,100 / $5,933 / $1,050 / $2,501 / $700 /
    $1,318 / $24,602 / Costs based on uncompleted contracts
    30-Nov-44 / L-4 / $2,210 / CF / CF / $150 / $- / $247 / $2,607 / Costs based on uncompleted contracts
    30-Nov-44 / L-5 / $6,199 / $1,956 / $149 / $445 / $27 / $263 / $9,039 / Costs based on uncompleted contracts
    30-Nov-44 / R-4 / $39,152 / $3,401 / $- / $667 / $- / $229 / $43,449 / Costs based on uncompleted contracts
    30-Nov-44 / R-5 / $50,586 / $7,259 / $- / $1,152 / $14 / $1,460
    / $60,471 / Costs based on uncompleted contracts
    30-Nov-44 / R-6 / $41,145 / $4,663 / $- / $1,019 / $14 / $1,152
    / $47,993 / Costs based on uncompleted contracts
    31-Aug-44 / B-29 / $469,269 / $100,406 / $12,433 / $125,863 /
    $5,526 / $34,738 / $748,235 / Airframe and engine costs subject to revision. Costs based on uncompleted contracts
    31-Aug-44 / B-32 / $522,661 / $100,406 / $20,841 / $66,491 / $4,624
    / $34,150 / $749,173 / Costs based on uncompleted contracts
    31-Aug-44 / B-17 / $129,150 / $35,521 / $11,247 / $47,425 / $5,966
    / $9,040 / $238,349 / Costs based on uncompleted contracts
    31-Aug-44 / B-24 / $138,585 / $33,363 / $13,004 / $47,956 / $4,520
    / $8,474 / $245,902 / Costs based on uncompleted contracts
    31-Aug-44 / B-25 / $94,229 / $29,104 / $5,096 / $15,392 / $10,827
    / $8,337 / $162,985 / Costs based on uncompleted contracts
    31-Aug-44 / B-26 / $120,048 / $43,171 / $14,145 / $20,169 / $5,296
    / $7,749 / $210,578 / Costs based on uncompleted contracts
    31-Aug-44 / A-20 / $61,510 / $29,945 / $4,388 / $14,155 / $3,204 / $3,813 / $117,015 / Costs based on uncompleted contracts
    31-Aug-44 / A-26 / $112,214 / $33,838 / $5,096 / $29,487 / $13,213
    / $3,939 / $197,787 / Costs based on uncompleted contracts
    31-Aug-44 / P-38 / $70,168 / $19,344 / $5,386 / $6,383 / $2,914 / $3,631 / $107,826 / Costs based on uncompleted contracts
    31-Aug-44 / P-59 / $128,961 / $75,000 / $- / $2,169 / $3,984 /
    $2,864 / $212,978 / Costs based on uncompleted contracts
    31-Aug-44 / P-82 / $86,540 / $36,000 / $4,600 / $3,229 / $444 / $1,545 / $132,358 / Costs based on uncompleted contracts
    31-Aug-44 / P-39 / $26,471 / $12,545 / $3,750 / $2,673 / $4,712 / $2,633 / $52,784 / Costs based on uncompleted contracts
    31-Aug-44 / P-40 / $26,352 / $10,503 / $3,110 / $2,068 / $2,646 / $2,904 / $47,583 / Costs based on uncompleted contracts
    31-Aug-44 / P-47 / $55,783 / $23,852 / $6,960 / $5,357 / $3,506 / $2,948 / $98,406 / Costs based on uncompleted contracts
    31-Aug-44 / P-51 / $27,889 / $17,545 / $4,391 / $2,236 / $2,574 / $2,780 / $57,415 / Costs based on uncompleted contracts
    31-Aug-44 / P-72 / $153,672 / $6,500 / $11,000 / $2,910 / $2,594 / $2,836 / $179,512 / Costs based on uncompleted contracts
    31-Aug-44 / P-75 / $83,585 / $31,420 / $9,500 / $2,839 / $4,366 / $3,688 / $135,398 / Costs based on uncompleted contracts
    31-Aug-44 / P-80 / $55,845 / $55,000 / $- / $3,035 / $2,632 /
    $3,500 / $120,012 / Costs based on uncompleted contracts
    31-Aug-44 / F-11 / $447,620 / $55,000 / $25,000 / $10,647 / $15 / $10,500 / $548,782 / Costs based on uncompleted contracts
    31-Aug-44 / OA-10 (PBY) / $216,250 / CF / CF / CF / $- / CF / $216,250
    / Costs based on uncompleted contracts
    31-Aug-44 / C-54 / $250,515 / $59,398 / $8,729 / $9,762 / $15 / $7,918 / $336,337 / Costs based on uncompleted contracts
    31-Aug-44 / C-69 / $534,367 / $92,892 / $14,073 / $7,736 / $15 / $7,067 / $656,150 / Costs based on uncompleted contracts
    31-Aug-44 / C-74 / $949,740 / $92,379 / $12,200 / $27,356 / $15 / $6,761 / $1,088,451 / Costs based on uncompleted contracts
    31-Aug-44 / C-87 / $155,000 / $28,334 / $9,840 / $22,811 / $15 / $6,935 / $222,935 / Costs based on uncompleted contracts
    31-Aug-44 / C-45 / $38,764 / $14,519 / $4,100 / $5,292 / $- /
    $3,670 / $66,345 / Costs based on uncompleted contracts
    31-Aug-44 / C-46 / $189,865 / $31,748 / $13,966 / $9,814 / $15 / $9,277 / $254,685 / Costs based on uncompleted contracts
    31-Aug-44 / C-47 / $61,062 / $18,707 / $3,804 / $8,160 / $15 / $14,574 / $106,322 / Costs based on uncompleted contracts
    31-Aug-44 / C-82 / $427,244 / $31,748 / $3,880 / $8,205 / $15 / $6,415 / $477,507 / Costs based on uncompleted contracts
    31-Aug-44 / UC-61 / $9,394 / $3,187 / $150 / $207 / $- / $2,209
    / $15,147 / Costs based on uncompleted contracts
    31-Aug-44 / C-64 / $26,521 / $5,769 / $1,062 / $2,056 / $14 /
    $1,544 / $36,966 / Costs based on uncompleted contracts
    31-Aug-44 / AT-7 / $41,275 / $10,286 / $2,050 / $8,250 / $- /
    $2,299 / $64,160 / Costs based on uncompleted contracts
    31-Aug-44 / AT-21 / $62,389 / $24,292 / $1,844 / $8,457 / $1,025 / $2,758 / $100,765 / Costs based on uncompleted contracts
    31-Aug-44 / AT-6 / $12,970 / $6,122 / $1,068 / $2,986 / $676 /
    $1,318 / $25,140 / Costs based on uncompleted contracts
    31-Aug-44 / AT-19 / $17,736 / $3,805 / $905 / $440 / $- / No info.
    / $22,886 / Costs based on uncompleted contracts
    31-Aug-44 / L-4 / $2,277 / CF / CF / $150 / $- / $247 / $2,674 / Costs based on uncompleted contracts
    31-Aug-44 / L-5 / $6,359 / $1,956 / $149 / $463 / $26 / $263 / $9,216 / Costs based on uncompleted contracts
    31-Aug-44 / R-4 / $39,152 / $3,406 / $- / $667 / $- / $229 / $43,454 / Costs based on uncompleted contracts
    31-Aug-44 / R-5 / $50,586 / $7,259 / $- / $1,152 / $14 / $1,460
    / $60,471 / Costs based on uncompleted contracts
    31-Aug-44 / R-6 / $41,142 / $4,663 / $- / $1,019 / $14 / $1,152
    / $47,990 / Costs based on uncompleted contracts
    31-Aug-44 / CG-4A / $21,317 / $- / $- / $1,123 / $- / $155 / $22,595 / 15 place. Costs based on uncompleted contracts
    31-Jul-44 / B-29 / $478,180 / $100,406 / $12,181 / $125,919 /
    $5,525 / $34,738 / $756,949 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / B-32 / $540,305 / $100,406 / $18,000 / $68,734 / $4,624
    / $34,150 / $766,219 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / B-17 / $157,484 / $37,480 / $11,755 / $48,939 / $5,999
    / $10,305 / $271,962 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / B-24 / $169,452 / $36,539 / $12,899 / $49,034 / $4,726
    / $9,752 / $282,402 / Costs are weighted average of all Army contracts
    from 1939 to date
    31-Jul-44 / B-25 / $93,690 / $29,589 / $5,201 / $20,514 / $8,041 / $8,899 / $165,934 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / B-26 / $140,735 / $48,097 / $13,999 / $22,041 / $5,059
    / $12,590 / $242,521 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / B-34 / $108,558 / $44,000 / $5,000 / $29,449 / CF /
    $1,250 / $188,257 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / A-20 / $75,448 / $26,333 / $5,020 / $9,920 / $3,768 / $3,828 / $124,317 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / A-26 / $112,264 / $33,838 / $5,096 / $29,488 / $13,213
    / $3,939 / $197,838 / Costs are weighted average of all Army contracts
    from 1939 to date
    31-Jul-44 / A-28 / $91,499 / $19,634 / $5,000 / $9,038 / $- /
    $250 / $125,421 / Costs are weighted average of all Army contracts from
    1939 to date
    31-Jul-44 / A-29 / $89,262 / $21,653 / $5,000 / $9,038 / $2,093 / $250 / $127,296 / Costs are weighted average of all Army contracts from
    1939 to date
    31-Jul-44 / A-30 / $110,586 / $28,427 / $4,664 / $3,250 / $2,773 / $3,583 / $153,283 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / A-24 / $35,922 / $8,971 / $1,739 / $2,876 / $1,720 / $5,197 / $56,425 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / A-25 / $67,492 / $14,001 / $3,988 / $6,692 / $2,303 / $3,818 / $98,294 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / A-31 / $65,852 / $17,990 / $2,330 / $1,863 / $1,978 / $250 / $90,263 / Costs are weighted average of all Army contracts from
    1939 to date
    31-Jul-44 / A-35 / $56,166 / $14,552 / $2,353 / $3,026 / $2,270 / $3,911 / $82,278 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / A-36 (P-51) / $36,706 / $12,000 / $3,680 / $2,670 /
    $2,632 / $2,516 / $60,204 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-38 / $73,607 / $21,096 / $5,822 / $7,748 / $3,531 / $3,873 / $115,677 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-59 / $128,961 / $75,000 / $- / $2,169 / $3,984 /
    $2,864 / $212,978 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-61 / $191,831 / $49,392 / $11,841 / $18,144 / $6,308
    / $19,918 / $297,434 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-70 / $79,865 / $29,372 / $5,186 / $24,052 / $1,341 / $3,260 / $143,076 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-82 / $86,540 / $36,000 / $4,600 / $3,229 / $444 / $1,545 / $132,358 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-39 / $32,824 / $13,518 / $4,972 / $2,907 / $5,767 / $4,305 / $64,293 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-40 / $29,515 / $13,905 / $3,266 / $2,325 / $3,237 / $3,720 / $55,968 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-47 / $61,699 / $24,313 / $6,922 / $5,767 / $3,504 / $3,303 / $105,508 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-51 / $28,984 / $17,328 / $4,887 / $2,322 / $2,493 / $2,830 / $58,844 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-63 / $28,551 / $13,944 / $5,238 / $2,984 / $4,969 / $2,636 / $58,322 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-72 / $153,672 / $6,500 / $11,000 / $2,910 / $2,594 / $2,836 / $179,512 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-75 / $83,585 / $31,420 / $9,500 / $2,839 / $4,366 / $3,688 / $135,398 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / F-3 (A-20) / $103,627 / $29,372 / $5,186 / $20,207 /
    $1,341 / $3,260 / $162,993 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / O-52 / $24,558 / $6,000 / $1,575 / $4,780 / $697 /
    $4,930 / $42,540 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / OA-10 (PBY) / $158,941 / $25,269 / in GFE / $24,975 /
    $3,174 / $10,440 / $222,799 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / C-54 / $262,501 / $59,639 / $9,468 / $9,804 / $15 / $7,824 / $349,251 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / C-69 / $534,331 / $92,892 / $15,120 / $7,736 / $15 / $7,067 / $657,161 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / C-74 / $949,740 / $92,379 / $12,200 / $27,356 / $15 / $6,761 / $1,088,451 / Costs are weighted average of all Army contracts
    from 1939 to date
    31-Jul-44 / C-87 / $196,474 / $31,517 / $9,840 / $22,099 / $211 / $6,935 / $267,076 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / C-46 / $197,639 / $33,772 / $13,821 / $9,981 / $15 / $9,315 / $264,543 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / C-47 / $73,749 / $17,428 / $4,616 / $5,707 / $16 /

    [continued in next message]

    --- SoupGate-Win32 v1.05
    * Origin: fsxNet Usenet Gateway (21:1/5)
  • From SolomonW@21:1/5 to Geoffrey Sinclair on Sun Oct 10 12:18:39 2021
    On Sat, 9 Oct 2021 23:38:10 +1100, Geoffrey Sinclair wrote:

    Aircraft Unit costs, US Archives RG18 E 10 B 68, CF Contractor Furnished,
    GFE Government Furnished Equipment
    Date / Model / Airframe / Engines(s) / Propeller(s) / GFE / Ordnance / Communications / Total / Notes
    28-Feb-43 / B-29 / $362,347 / $101,685 / $10,328 / $125,341 /
    $4,836 / $34,738 / $639,275 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / B-32 / $522,613 / $101,685 / $23,310 / $68,947 / $3,247 / $34,150 / $753,952 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / B-17 / $111,443 / $34,287 / $3,400 / $45,606 / $4,595
    / $9,040 / $208,371 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / B-24 / $115,338 / $32,659 / $4,220 / $49,781 / $3,205
    / $8,474 / $213,677 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / B-25 / $59,358 / $29,131 / $3,071 / $19,805 / $4,147 / $8,337 / $123,849 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / B-26 / $106,677 / $43,171 / $14,110 / $21,647 / $3,547
    / $7,749 / $196,901 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / B-34 / $108,558 / $44,000 / $5,000 / $29,449 / CF / $1,250 / $188,257 / Costs based on final production contract
    28-Feb-43 / A-20 / $44,366 / $30,795 / $4,428 / $18,364 / $2,345 / $3,813 / $104,111 / Costs based on final production contract
    28-Feb-43 / A-26 / $106,807 / $33,466 / $3,700 / $29,277 / $14,067
    / $3,948 / $191,265 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / A-28 / $93,725 / $19,634 / $5,000 / $9,038 / $- /
    $250 / $127,647 / Costs based on final production contract
    28-Feb-43 / A-29 / $91,688 / $23,000 / $5,000 / $9,038 / $2,093 / $250 / $131,069 / Costs based on final production contract
    28-Feb-43 / A-30 / $103,962 / $29,104 / $4,668 / $3,712 / $2,737 / $6,777 / $150,960 / Costs based on final production contract
    28-Feb-43 / A-24 / $33,172 / $9,103 / $1,739 / $1,997 / $1,640 / $4,800 / $52,451 / Costs based on final production contract
    28-Feb-43 / A-25 / $67,492 / $13,559 / $3,988 / $1,997 / $2,240 / $3,500 / $92,776 / Costs based on final production contract
    28-Feb-43 / A-31 / $67,230 / $13,859 / $2,330 / $1,863 / $1,978 / $250 / $87,510 / Costs based on final production contract
    28-Feb-43 / A-35 / $36,874 / $13,351 / $2,353 / $3,026 / $2,270 / $3,911 / $61,785 / Costs based on final production contract
    28-Feb-43 / A-36 (P-51) / $36,706 / $12,000 / $3,680 / $2,670 / $2,632 / $2,516 / $60,204 / Costs based on final production contract 28-Feb-43 / P-38 / $74,536 / $18,866 / $5,270 / $5,293 / $2,405 / $3,631 / $110,001 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / P-59 / $157,295 / $75,000 / $- / $2,001 / $4,034 / $2,864 / $241,194 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / P-61 / $154,899 / $44,714 / $6,352 / $14,507 / $4,684
    / $19,758 / $244,914 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / P-70 / $79,865 / $29,372 / $5,186 / $24,052 / $1,341 / $3,260 / $143,076 / Costs based on final production contract
    28-Feb-43 / P-82 / $86,540 / $36,000 / $7,471 / $3,967 / $1,870 / $1,545 / $137,393 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / P-39 / $24,866 / $12,545 / $3,256 / $2,673 / $4,712 / $2,633 / $50,685 / Costs based on final production contract
    28-Feb-43 / P-40 / $26,709 / $7,714 / $2,635 / $2,068 / $2,646 / $2,904 / $44,676 / Costs based on final production contract
    28-Feb-43 / P-43 / $54,907 / $12,635 / $4,500 / $5,231 / $2,490 / $3,160 / $82,923 / Costs based on final production contract
    28-Feb-43 / P-47 / $47,796 / $22,608 / $5,975 / $5,651 / $2,527 / $3,295 / $87,852 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / P-51 / $23,583 / $17,558 / $3,740 / $2,649 / $1,905 / $2,780 / $52,215 / Merlin Versions. Costs based on weighted average of uncompleted contracts
    28-Feb-43 / P-63 / $28,049 / $13,183 / $3,540 / $3,693 / $4,296 / $2,640 / $55,401 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / P-66 / $70,503 / $17,509 / CF / CF / No info. /
    $3,160 / $91,172 / Costs based on final production contract
    28-Feb-43 / P-75 / $82,863 / $31,420 / $9,083 / $2,788 / $4,366 / $3,688 / $134,208 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / P-80 / $75,913 / $30,000 / $- / $2,944 / $1,897 / $2,317 / $113,071 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / F-3 (A-20) / $103,627 / $29,372 / $5,186 / $20,207 / $1,341 / $3,260 / $162,993 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / F-11 / $447,770 / $110,000 / $25,000 / $10,647 / $15 / $10,500 / $603,932 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / OA-10 (PBY) / $216,250 / CF / CF / $559 / $- / CF / $216,809 / Costs based on weighted average of uncompleted contracts 28-Feb-43 / OA-11 / $175,000 / CF / CF / CF / $- / $- /
    $175,000 / Costs based on final production contract
    28-Feb-43 / OA-12 (J2F) / $69,000 / CF / CF / CF / $- / $- / $69,000 / Costs based on final production contract
    28-Feb-43 / TO-50 / $48,431 / CF / $250 / $919 / $26 / $1,200 / $50,826 / Costs based on final production contract
    28-Feb-43 / O-52 / $24,558 / $6,000 / $1,575 / $4,780 / $697 / $4,930 / $42,540 / Costs based on final production contract
    28-Feb-43 / C-54 / $243,277 / $50,186 / $5,200 / $10,888 / $113 / $7,995 / $317,659 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / C-69 / $488,477 / $95,643 / $6,360 / $10,788 / $15 / $7,067 / $608,350 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / C-74 / $949,485 / $220,000 / $12,200 / $19,698 / $15 / $6,761 / $1,208,159 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / C-87 / $161,800 / $35,933 / $9,840 / $21,111 / $484 / $6,935 / $236,103 / Costs based on final production contract
    28-Feb-43 / C-45 / $34,963 / $8,917 / $1,892 / $4,027 / No info. / $3,670 / $53,469 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / C-46 / $174,660 / $28,080 / $9,630 / $8,600 / $13 / $9,277 / $230,260 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / C-47 / $49,719 / $13,650 / $2,640 / $8,029 / $14 / $14,575 / $88,627 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / C-48 / $91,000 / $30,000 / $4,594 / $413 / $30 /
    $8,460 / $134,497 / Costs based on final production contract
    28-Feb-43 / C-49 / $136,997 / CF / CF / $1,844 / $15 / $8,811 / $147,667 / Costs based on final production contract
    28-Feb-43 / C-50 / $95,381 / $19,104 / $4,594 / $725 / No info. / $7,849 / $127,653 / Costs based on final production contract
    28-Feb-43 / C-51 / $100,689 / $18,324 / $4,594 / $725 / No info. / $7,849 / $132,181 / Costs based on final production contract
    28-Feb-43 / C-52 / $105,973 / $24,780 / $4,594 / $725 / No info. / $7,849 / $143,921 / Costs based on final production contract
    28-Feb-43 / C-53 / $142,231 / CF / CF / $1,844 / $15 / $6,380 / $150,470 / Costs based on final production contract
    28-Feb-43 / C-55 / $353,707 / CF / CF / CF / No info. / $7,849 /
    $361,556 / Costs based on final production contract
    28-Feb-43 / C-56 / $108,797 / CF / CF / CF / No info. / No info. /
    $108,797 / Costs based on final production contract
    28-Feb-43 / C-57 / $112,377 / CF / CF / CF / No info. / No info. /
    $112,377 / Costs based on final production contract
    28-Feb-43 / C-59 / $92,833 / $17,000 / CF / CF / $- / $250 /
    $110,083 / Costs based on final production contract
    28-Feb-43 / C-60 / $79,644 / $18,057 / $4,472 / $4,038 / $15 / $6,942 / $113,168 / Costs based on final production contract
    28-Feb-43 / C-68 / $139,966 / CF / CF / CF / No info. / $7,849 / $147,815 / Costs based on final production contract
    28-Feb-43 / C-76 / $137,125 / $14,690 / $5,950 / $9,280 / $15 / $7,100 / $174,160 / Costs based on final production contract
    28-Feb-43 / C-78 / $16,873 / $5,852 / $1,988 / $2,657 / $15 / $6,348 / $33,733 / Costs based on final production contract
    28-Feb-43 / C-82 / $427,244 / $36,000 / $3,880 / $8,592 / $15 / $6,415 / $482,146 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / C-43 / $18,732 / $5,074 / $1,104 / $1,162 / $- /
    $1,260 / $27,332 / Costs based on final production contract
    28-Feb-43 / C-61 / $9,464 / $4,093 / CF / $207 / $- / $2,209 / $15,973 / Costs based on final production contract
    28-Feb-43 / C-64 / $24,839 / $5,869 / $855 / $2,134 / $10 /
    $1,544 / $35,251 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / AT-7 / $41,719 / $14,519 / $2,050 / $8,250 / $- / $3,671 / $70,209 / Costs based on final production contract
    28-Feb-43 / AT-8 / $25,646 / $7,438 / $1,932 / $5,455 / $- /
    $1,230 / $41,701 / Costs based on final production contract
    28-Feb-43 / AT-9 / $27,603 / $6,947 / $1,700 / $7,042 / $- /
    $1,100 / $44,392 / Costs based on final production contract
    28-Feb-43 / AT-10 / $29,600 / $7,534 / $1,665 / $5,271 / $- /
    $925 / $44,995 / Costs based on final production contract
    28-Feb-43 / AT-11 / $36,447 / $14,519 / $1,965 / $8,250 / $650 / $2,636 / $64,467 / Costs based on final production contract
    28-Feb-43 / AT-17 / $17,383 / $5,852 / $354 / $2,781 / $- /
    $1,100 / $27,470 / Costs based on final production contract
    28-Feb-43 / AT-18 / $82,309 / $18,339 / $4,600 / $7,863 / $1,025 / $6,586 / $120,722 / Costs based on final production contract
    28-Feb-43 / AT-20 / $44,737 / CF / CF / CF / $- / No info. / $44,737 / Costs based on final production contract
    28-Feb-43 / AT-21 / $60,715 / $24,292 / $1,740 / $8,473 / $1,025 / $2,829 / $99,074 / Costs based on final production contract
    28-Feb-43 / AT-6 / $11,500 / $5,869 / $853 / $2,409 / $270 /
    $1,318 / $22,219 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / AT-16 / $18,594 / $5,880 / $1,068 / $1,874 / $- / CF
    / $27,416 / Costs based on final production contract
    28-Feb-43 / AT-19 / $17,736 / $3,470 / $850 / $440 / $- / No
    info. / $22,496 / Costs based on final production contract
    28-Feb-43 / BT-12 / $29,159 / $8,558 / $900 / $2,335 / $- /
    $1,385 / $42,337 / Costs based on final production contract
    28-Feb-43 / BT-13 / $7,076 / $7,260 / $900 / $2,360 / $- / $1,352 / $18,948 / Costs based on final production contract
    28-Feb-43 / BT-15 / $13,778 / $5,542 / $900 / $2,313 / $- /
    $1,356 / $23,889 / Costs based on final production contract
    28-Feb-43 / PT-13 / $6,045 / $4,227 / $645 / $1,374 / $- / $- / $12,291 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / PT-17 / $5,530 / $2,350 / $357 / $602 / $- / $97 / $8,936 / Costs based on final production contract
    28-Feb-43 / PT-18 / $5,943 / $2,400 / $377 / $1,099 / $- / $- / $9,819 / Costs based on final production contract
    28-Feb-43 / PT-19 / $8,107 / $3,317 / $150 / $429 / $- / $97 / $12,100 / Costs based on final production contract
    28-Feb-43 / PT-22 / $8,226 / CF / CF / $247 / $- / $- / $8,473 / Costs based on final production contract
    28-Feb-43 / PT-23 / $11,059 / $3,316 / $215 / $755 / $- / $97 / $15,442 / Costs based on final production contract
    28-Feb-43 / PT-24 / $5,133 / Brit. Fr. / CF / CF / $- / $83 / $5,216
    / Costs based on final production contract
    28-Feb-43 / PT-26 / $10,285 / $3,187 / $150 / $1,347 / $- / $83
    / $15,052 / Costs based on final production contract
    28-Feb-43 / PT-27 / $5,341 / $2,678 / CF / CF / $- / $83 /
    $8,102 / Costs based on final production contract
    28-Feb-43 / L-1 / $20,368 / $3,860 / $1,125 / $1,191 / $26 /
    $1,200 / $27,770 / Costs based on final production contract
    28-Feb-43 / L-2 / $2,667 / CF / CF / $84 / $- / $247 / $2,998
    / Costs based on final production contract
    28-Feb-43 / L-3 / $2,138 / CF / CF / $11 / $- / $247 / $2,396
    / Costs based on final production contract
    28-Feb-43 / L-4 / $2,227 / CF / CF / $152 / $- / $247 / $2,626
    / Costs based on final production contract
    28-Feb-43 / L-5 / $6,164 / $1,956 / $352 / $427 / $10 / $263 / $9,172 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / L-6 / $6,054 / CF / CF / $11 / $- / $61 / $6,126 / Total in table minus Comms cost. Costs based on final production contract 28-Feb-43 / R-4 / $39,317 / $3,401 / $- / $667 / $- / $229 / $43,614 / Costs based on weighted average of uncompleted contracts
    28-Feb-43 / R-5 / $50,600 / $7,259 / $- / $1,208 / $10 / $1,460
    / $60,537 / Costs based on weighted average of uncompleted contracts 28-Feb-43 / R-6 / $41,222 / $4,663 / $- / $1,153 / $10 / $1,152
    / $48,200 / Costs based on weighted average of uncompleted contracts 30-Nov-44 / B-29 / $434,512 / $101,877 / $13,628 / $124,787 /
    $5,531 / $34,738 / $715,073 / Costs based on uncompleted contracts 30-Nov-44 / B-32 / $522,816 / $101,877 / $24,892 / $71,208 / $4,624 / $34,150 / $759,567 / Costs based on uncompleted contracts
    30-Nov-44 / B-17 / $125,464 / $34,875 / $6,487 / $46,413 / $5,686
    / $9,040 / $227,965 / Costs based on uncompleted contracts
    30-Nov-44 / B-24 / $114,951 / $34,497 / $8,663 / $48,288 / $4,505
    / $8,474 / $219,378 / Costs based on uncompleted contracts
    30-Nov-44 / B-25 / $89,920 / $29,131 / $3,071 / $19,703 / $5,837 / $8,337 / $155,999 / Costs based on uncompleted contracts
    30-Nov-44 / B-26 / $110,260 / $43,171 / $14,110 / $21,647 / $5,028
    / $7,749 / $201,965 / Costs based on uncompleted contracts
    30-Nov-44 / A-26 / $116,760 / $34,194 / $3,034 / $29,488 / $13,213
    / $3,939 / $200,628 / Costs based on uncompleted contracts
    30-Nov-44 / P-38 / $74,673 / $18,867 / $5,270 / $6,199 / $2,901 / $3,631 / $111,541 / Costs based on uncompleted contracts
    30-Nov-44 / P-59 / $129,296 / $75,000 / $- / $2,001 / $4,034 / $2,864 / $213,195 / Costs based on uncompleted contracts
    30-Nov-44 / P-61 / $147,960 / $44,729 / $9,720 / $17,611 / $6,245
    / $19,758 / $246,023 / Costs based on uncompleted contracts
    30-Nov-44 / P-82 / $86,540 / $36,000 / $9,200 / $3,229 / $444 / $1,545 / $136,958 / Costs based on uncompleted contracts
    30-Nov-44 / P-47 / $49,420 / $22,608 / $5,257 / $5,210 / $3,506 / $3,295 / $89,296 / Costs based on uncompleted contracts
    30-Nov-44 / P-51 / $25,795 / $17,558 / $2,555 / $2,234 / $2,559 / $2,780 / $53,481 / Costs based on uncompleted contracts
    30-Nov-44 / P-63 / $29,194 / $13,183 / $3,282 / $3,373 / $5,140 / $2,638 / $56,810 / Costs based on uncompleted contracts
    30-Nov-44 / P-75 / $82,863 / $31,420 / $9,083 / $2,788 / $4,366 / $3,688 / $134,208 / Costs based on uncompleted contracts
    30-Nov-44 / P-80 / $55,845 / $55,000 / $- / $3,035 / $2,632 / $3,500 / $120,012 / Costs based on uncompleted contracts
    30-Nov-44 / YP-60 / $1,293,710 / $24,868 / $6,881 / $2,722 / $1,784 / $4,673 / $1,334,638 / Costs based on uncompleted contracts
    30-Nov-44 / F-11 / $447,770 / $110,000 / $25,000 / $10,647 / $15 / $10,500 / $603,932 / Costs based on uncompleted contracts
    30-Nov-44 / OA-10 (PBY) / $216,058 / CF / CF / $559 / $- / CF / $216,617 / Costs based on uncompleted contracts
    30-Nov-44 / C-54 / $256,186 / $58,094 / $6,287 / $9,949 / $15 / $7,637 / $338,168 / Costs based on uncompleted contracts
    30-Nov-44 / C-69 / $534,707 / $95,678 / $6,360 / $7,736 / $15 / $7,067 / $651,563 / Costs based on uncompleted contracts
    30-Nov-44 / C-74 / $949,740 / $92,379 / $12,200 / $27,356 / $15 / $6,761 / $1,088,451 / Costs based on uncompleted contracts
    30-Nov-44 / C-45 / $36,585 / $10,705 / $2,050 / $4,894 / $- / $3,671 / $57,905 / Costs based on uncompleted contracts
    30-Nov-44 / C-46 / $174,696 / $31,748 / $12,244 / $8,785 / $15 / $9,277 / $236,765 / Costs based on uncompleted contracts
    30-Nov-44 / C-47 / $53,490 / $13,733 / $3,028 / $7,805 / $15 / $15,220 / $93,291 / Costs based on uncompleted contracts
    30-Nov-44 / C-82 / $427,244 / $31,748 / $3,880 / $8,205 / $15 / $6,415 / $477,507 / Costs based on uncompleted contracts
    30-Nov-44 / C-64 / $24,839 / $5,933 / $1,055 / $2,056 / $14 / $1,544 / $35,441 / Costs based on uncompleted contracts
    30-Nov-44 / AT-6 / $13,100 / $5,933 / $1,050 / $2,501 / $700 / $1,318 / $24,602 / Costs based on uncompleted contracts
    30-Nov-44 / L-4 / $2,210 / CF / CF / $150 / $- / $247 / $2,607 / Costs based on uncompleted contracts
    30-Nov-44 / L-5 / $6,199 / $1,956 / $149 / $445 / $27 / $263 / $9,039 / Costs based on uncompleted contracts
    30-Nov-44 / R-4 / $39,152 / $3,401 / $- / $667 / $- / $229 / $43,449 / Costs based on uncompleted contracts
    30-Nov-44 / R-5 / $50,586 / $7,259 / $- / $1,152 / $14 / $1,460
    / $60,471 / Costs based on uncompleted contracts
    30-Nov-44 / R-6 / $41,145 / $4,663 / $- / $1,019 / $14 / $1,152
    / $47,993 / Costs based on uncompleted contracts
    31-Aug-44 / B-29 / $469,269 / $100,406 / $12,433 / $125,863 /
    $5,526 / $34,738 / $748,235 / Airframe and engine costs subject to revision. Costs based on uncompleted contracts
    31-Aug-44 / B-32 / $522,661 / $100,406 / $20,841 / $66,491 / $4,624 / $34,150 / $749,173 / Costs based on uncompleted contracts
    31-Aug-44 / B-17 / $129,150 / $35,521 / $11,247 / $47,425 / $5,966
    / $9,040 / $238,349 / Costs based on uncompleted contracts
    31-Aug-44 / B-24 / $138,585 / $33,363 / $13,004 / $47,956 / $4,520
    / $8,474 / $245,902 / Costs based on uncompleted contracts
    31-Aug-44 / B-25 / $94,229 / $29,104 / $5,096 / $15,392 / $10,827
    / $8,337 / $162,985 / Costs based on uncompleted contracts
    31-Aug-44 / B-26 / $120,048 / $43,171 / $14,145 / $20,169 / $5,296
    / $7,749 / $210,578 / Costs based on uncompleted contracts
    31-Aug-44 / A-20 / $61,510 / $29,945 / $4,388 / $14,155 / $3,204 / $3,813 / $117,015 / Costs based on uncompleted contracts
    31-Aug-44 / A-26 / $112,214 / $33,838 / $5,096 / $29,487 / $13,213
    / $3,939 / $197,787 / Costs based on uncompleted contracts
    31-Aug-44 / P-38 / $70,168 / $19,344 / $5,386 / $6,383 / $2,914 / $3,631 / $107,826 / Costs based on uncompleted contracts
    31-Aug-44 / P-59 / $128,961 / $75,000 / $- / $2,169 / $3,984 / $2,864 / $212,978 / Costs based on uncompleted contracts
    31-Aug-44 / P-82 / $86,540 / $36,000 / $4,600 / $3,229 / $444 / $1,545 / $132,358 / Costs based on uncompleted contracts
    31-Aug-44 / P-39 / $26,471 / $12,545 / $3,750 / $2,673 / $4,712 / $2,633 / $52,784 / Costs based on uncompleted contracts
    31-Aug-44 / P-40 / $26,352 / $10,503 / $3,110 / $2,068 / $2,646 / $2,904 / $47,583 / Costs based on uncompleted contracts
    31-Aug-44 / P-47 / $55,783 / $23,852 / $6,960 / $5,357 / $3,506 / $2,948 / $98,406 / Costs based on uncompleted contracts
    31-Aug-44 / P-51 / $27,889 / $17,545 / $4,391 / $2,236 / $2,574 / $2,780 / $57,415 / Costs based on uncompleted contracts
    31-Aug-44 / P-72 / $153,672 / $6,500 / $11,000 / $2,910 / $2,594 / $2,836 / $179,512 / Costs based on uncompleted contracts
    31-Aug-44 / P-75 / $83,585 / $31,420 / $9,500 / $2,839 / $4,366 / $3,688 / $135,398 / Costs based on uncompleted contracts
    31-Aug-44 / P-80 / $55,845 / $55,000 / $- / $3,035 / $2,632 / $3,500 / $120,012 / Costs based on uncompleted contracts
    31-Aug-44 / F-11 / $447,620 / $55,000 / $25,000 / $10,647 / $15 / $10,500 / $548,782 / Costs based on uncompleted contracts
    31-Aug-44 / OA-10 (PBY) / $216,250 / CF / CF / CF / $- / CF / $216,250
    / Costs based on uncompleted contracts
    31-Aug-44 / C-54 / $250,515 / $59,398 / $8,729 / $9,762 / $15 / $7,918 / $336,337 / Costs based on uncompleted contracts
    31-Aug-44 / C-69 / $534,367 / $92,892 / $14,073 / $7,736 / $15 / $7,067 / $656,150 / Costs based on uncompleted contracts
    31-Aug-44 / C-74 / $949,740 / $92,379 / $12,200 / $27,356 / $15 / $6,761 / $1,088,451 / Costs based on uncompleted contracts
    31-Aug-44 / C-87 / $155,000 / $28,334 / $9,840 / $22,811 / $15 / $6,935 / $222,935 / Costs based on uncompleted contracts
    31-Aug-44 / C-45 / $38,764 / $14,519 / $4,100 / $5,292 / $- / $3,670 / $66,345 / Costs based on uncompleted contracts
    31-Aug-44 / C-46 / $189,865 / $31,748 / $13,966 / $9,814 / $15 / $9,277 / $254,685 / Costs based on uncompleted contracts
    31-Aug-44 / C-47 / $61,062 / $18,707 / $3,804 / $8,160 / $15 / $14,574 / $106,322 / Costs based on uncompleted contracts
    31-Aug-44 / C-82 / $427,244 / $31,748 / $3,880 / $8,205 / $15 / $6,415 / $477,507 / Costs based on uncompleted contracts
    31-Aug-44 / UC-61 / $9,394 / $3,187 / $150 / $207 / $- / $2,209
    / $15,147 / Costs based on uncompleted contracts
    31-Aug-44 / C-64 / $26,521 / $5,769 / $1,062 / $2,056 / $14 / $1,544 / $36,966 / Costs based on uncompleted contracts
    31-Aug-44 / AT-7 / $41,275 / $10,286 / $2,050 / $8,250 / $- / $2,299 / $64,160 / Costs based on uncompleted contracts
    31-Aug-44 / AT-21 / $62,389 / $24,292 / $1,844 / $8,457 / $1,025 / $2,758 / $100,765 / Costs based on uncompleted contracts
    31-Aug-44 / AT-6 / $12,970 / $6,122 / $1,068 / $2,986 / $676 / $1,318 / $25,140 / Costs based on uncompleted contracts
    31-Aug-44 / AT-19 / $17,736 / $3,805 / $905 / $440 / $- / No info. / $22,886 / Costs based on uncompleted contracts
    31-Aug-44 / L-4 / $2,277 / CF / CF / $150 / $- / $247 / $2,674 / Costs based on uncompleted contracts
    31-Aug-44 / L-5 / $6,359 / $1,956 / $149 / $463 / $26 / $263 / $9,216 / Costs based on uncompleted contracts
    31-Aug-44 / R-4 / $39,152 / $3,406 / $- / $667 / $- / $229 / $43,454 / Costs based on uncompleted contracts
    31-Aug-44 / R-5 / $50,586 / $7,259 / $- / $1,152 / $14 / $1,460
    / $60,471 / Costs based on uncompleted contracts
    31-Aug-44 / R-6 / $41,142 / $4,663 / $- / $1,019 / $14 / $1,152
    / $47,990 / Costs based on uncompleted contracts
    31-Aug-44 / CG-4A / $21,317 / $- / $- / $1,123 / $- / $155 / $22,595 / 15 place. Costs based on uncompleted contracts
    31-Jul-44 / B-29 / $478,180 / $100,406 / $12,181 / $125,919 /
    $5,525 / $34,738 / $756,949 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / B-32 / $540,305 / $100,406 / $18,000 / $68,734 / $4,624 / $34,150 / $766,219 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / B-17 / $157,484 / $37,480 / $11,755 / $48,939 / $5,999
    / $10,305 / $271,962 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / B-24 / $169,452 / $36,539 / $12,899 / $49,034 / $4,726
    / $9,752 / $282,402 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / B-25 / $93,690 / $29,589 / $5,201 / $20,514 / $8,041 / $8,899 / $165,934 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / B-26 / $140,735 / $48,097 / $13,999 / $22,041 / $5,059
    / $12,590 / $242,521 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / B-34 / $108,558 / $44,000 / $5,000 / $29,449 / CF / $1,250 / $188,257 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / A-20 / $75,448 / $26,333 / $5,020 / $9,920 / $3,768 / $3,828 / $124,317 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / A-26 / $112,264 / $33,838 / $5,096 / $29,488 / $13,213
    / $3,939 / $197,838 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / A-28 / $91,499 / $19,634 / $5,000 / $9,038 / $- /
    $250 / $125,421 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / A-29 / $89,262 / $21,653 / $5,000 / $9,038 / $2,093 / $250 / $127,296 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / A-30 / $110,586 / $28,427 / $4,664 / $3,250 / $2,773 / $3,583 / $153,283 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / A-24 / $35,922 / $8,971 / $1,739 / $2,876 / $1,720 / $5,197 / $56,425 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / A-25 / $67,492 / $14,001 / $3,988 / $6,692 / $2,303 / $3,818 / $98,294 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / A-31 / $65,852 / $17,990 / $2,330 / $1,863 / $1,978 / $250 / $90,263 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / A-35 / $56,166 / $14,552 / $2,353 / $3,026 / $2,270 / $3,911 / $82,278 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / A-36 (P-51) / $36,706 / $12,000 / $3,680 / $2,670 / $2,632 / $2,516 / $60,204 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-38 / $73,607 / $21,096 / $5,822 / $7,748 / $3,531 / $3,873 / $115,677 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-59 / $128,961 / $75,000 / $- / $2,169 / $3,984 / $2,864 / $212,978 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-61 / $191,831 / $49,392 / $11,841 / $18,144 / $6,308
    / $19,918 / $297,434 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-70 / $79,865 / $29,372 / $5,186 / $24,052 / $1,341 / $3,260 / $143,076 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-82 / $86,540 / $36,000 / $4,600 / $3,229 / $444 / $1,545 / $132,358 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-39 / $32,824 / $13,518 / $4,972 / $2,907 / $5,767 / $4,305 / $64,293 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-40 / $29,515 / $13,905 / $3,266 / $2,325 / $3,237 / $3,720 / $55,968 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-47 / $61,699 / $24,313 / $6,922 / $5,767 / $3,504 / $3,303 / $105,508 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-51 / $28,984 / $17,328 / $4,887 / $2,322 / $2,493 / $2,830 / $58,844 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-63 / $28,551 / $13,944 / $5,238 / $2,984 / $4,969 / $2,636 / $58,322 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-72 / $153,672 / $6,500 / $11,000 / $2,910 / $2,594 / $2,836 / $179,512 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / P-75 / $83,585 / $31,420 / $9,500 / $2,839 / $4,366 / $3,688 / $135,398 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / F-3 (A-20) / $103,627 / $29,372 / $5,186 / $20,207 / $1,341 / $3,260 / $162,993 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / O-52 / $24,558 / $6,000 / $1,575 / $4,780 / $697 / $4,930 / $42,540 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / OA-10 (PBY) / $158,941 / $25,269 / in GFE / $24,975 / $3,174 / $10,440 / $222,799 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / C-54 / $262,501 / $59,639 / $9,468 / $9,804 / $15 / $7,824 / $349,251 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / C-69 / $534,331 / $92,892 / $15,120 / $7,736 / $15 / $7,067 / $657,161 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / C-74 / $949,740 / $92,379 / $12,200 / $27,356 / $15 / $6,761 / $1,088,451 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / C-87 / $196,474 / $31,517 / $9,840 / $22,099 / $211 / $6,935 / $267,076 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / C-46 / $197,639 / $33,772 / $13,821 / $9,981 / $15 / $9,315 / $264,543 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / C-47 / $73,749 / $17,428 / $4,616 / $5,707 / $16 / $16,508 / $118,024 / Costs are weighted average of all Army contracts
    from 1939 to date
    31-Jul-44 / C-48 / $91,229 / $30,000 / $4,594 / $413 / $30 /
    $8,460 / $134,726 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / C-49 / $104,870 / $25,269 / $4,594 / $1,854 / $15 / $8,559 / $145,161 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / C-50 / $97,273 / $23,067 / $4,594 / $725 / No info. / $7,849 / $133,508 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / C-51 / $100,689 / $18,324 / $4,594 / $725 / No info. / $7,849 / $132,181 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / C-52 / $105,052 / $24,780 / $4,594 / $725 / No info. / $7,849 / $143,000 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / C-53 / $107,124 / $22,431 / $4,627 / $3,096 / $26 / $7,392 / $144,696 / Costs are weighted average of all Army contracts from 1939 to date
    31-Jul-44 / C-55 / $353,707 / CF / CF / CF / No info. / $7,849 / $361,556 / Costs are weighted average of all Army contracts from 1939 to date

    [continued in next message]

    --- SoupGate-Win32 v1.05
    * Origin: fsxNet Usenet Gateway (21:1/5)
  • From Keith Willshaw@21:1/5 to SolomonW on Fri Oct 15 16:24:01 2021
    On 10/10/2021 02:18, SolomonW wrote:

    Weapon costs are going up over time despite greater production, not sure whether its inflation or improvements in design mainly.


    As one would expect, someone has to pay for the new factories, tooling, materials etc. Willow Run for example was a brand new very large
    facility that was only in full production for a few years. Ford built
    the factory and sold it to the government then leased it back for the
    duration of the war. Post war they simply ceased leasing it.

    --- SoupGate-Win32 v1.05
    * Origin: fsxNet Usenet Gateway (21:1/5)