WC Docket No. 21-295 July 14, 2021
Report No. NCD-3293
Re: COPPER RETIREMENT NETWORK CHANGE CERTIFICATION RECEIVED
BellSouth Telecommunications, LLC d/b/a AT&T Florida (AT&T), an
incumbent local exchange carrier (LEC), has filed certification that
public notice of network change(s) involving the retirement of copper
has been provided through its publicly accessible Internet site, as
required by section 51.329(a)(2) of the rules of the Federal
Communications Commission (FCC or Commission), See 47 CFR §
51.329(a)(2). together with certification of service on identified interconnecting telephone exchange service providers, as required by
section 51.333(a). See 47 CFR section§ 51.333(a). Upon initial review the filing appears to be complete. See 47 CFR sections§ 51.325 through 51.335. Specific network change information can be obtained on the Internet
at:
https://ebiznet.att.com/networkreg/.
The incumbent LEC's certification(s) refer(s) to the change(s) identified below:
Network Disclosure Number
Type of Change(s)
Location of Change(s)
Planned Implementation Date(s)
ATT20210616C.1
Without affecting other facilities in the distribution area (DA), AT&T
plans to retire copper facilities associated with a certain downtown
city block located at several addresses. The existing structure on
the block is slated to be demolished and replaced with a new building,
and there are no current customers or working circuits at the
location. AT&T plans to construct Gigabit Passive Optical Network/Fiber-to-the-Premises (GPON/FTTP) facilities in preparation
for the future development.
In the following wire center in Hollywood, FL: Hollywood Main (HLWDFLMA); for copper facilities within DA 310118 associated with 1800, 1816, 1818, 1820, 1822, 1840, 1858, 1860 Hollywood Blvd. & 1835, 1836, 1840, 1842 S Young Circle, Hollywood, FL 33020.
On or after July 31, 2021
https://www.fcc.gov/document/wcb-copper-retirement-network-change-notification-filed-att-fl-20
--- SoupGate-Win32 v1.05
* Origin: fsxNet Usenet Gateway (21:1/5)